The Thuso (previously Witfontein) project is located on the farm Holfontein 111 IS (remaining extent) and farm Witrand 103IS portions, 11, 12, 15, 19 and 20 approximately 13km north west of the town of Bethal in the Mpumalanga Province.The proposed Witfontein project has a measured coal resource of 18.86
Glencore intends to develop a photovoltaic solar facility, including battery storage, at Glencore Eastern Mines located approximately 26km south of Steelpoort and 34km north-west of Lydenburg in Limpopo. Approximate coordinates for the centre of the site are: Lat: -24.970288°S; Long: 30.132833°E..
The project is located 270 kilometres south-west of Kimberley, the regional capital of the Northern Cape province. Importantly, the project has access to significant local and regional infrastructure, with mine infrastructure including a regional power grid feed, bitumen access roads, access to a bulk,
The expansion of the Mogalakwena mine at Sandsloot in Limpopo, involves transitioning from an open-pit operation to an underground platinum group metals (PGM) project. GPS coordinates lat: -23.971409; long: 28.913987.
Construction of the Bekezela Colliery – otherwise known as Palmietkuilen, near Springs in Gauteng. The prospecting right includes portions 1, 2, 4, 9, 13 and 19 of the Farm Palmietkuilen IR located in Springs, Sedibeng District, Gauteng. The mine, and mining-related infrastructure, will be placed on
This project entails the upgrading and expansion of the Chapudi coal project in Limpopo Province. Chapudi coal resource was bituminous and that it would be suitable for generating electricity. The exact co-ordinates are currently not available however the approximate area of location is lat: -22.481344;
Construction of water treatment plant, sewage treatment plant and associated pipelines at the New Denmark Colliery, near Thuthukani, Mpumalanga. Estimated GPS coordinates 26°46'37.2"S 29°19'32.8"E
The Egoli Project is a long life, low cost brownfield project in Evander, Mpumalanga. The project has an initial life of mine of 9 years, with annual gold production of approximately 72koz at an average head grade of 6.61g/t (LOM gold production of 17,771 kg (c.570koz)). First gold is expected to be
Construction of a 30MW solar plant at the Royal Bafokeng Platinum Mine in Rustenburg, North West. GPS coordinates lat: -25.6544482999999; long: 27.255854.
Somkhele Anthracite Mine has been a fully operational anthracite mine since 2007 and is operated and owned by Tendele Coal Mining (Pty) Ltd. Somkhele is located aproximately 16km west of Mtubatuba, in KwaZulu-Natal. Somkhele intends to extend its existing Luhlanga open cast pit as well as licence its