Expansion of the Burnstone Gold Mine near Balfour in Mpumalanga. The proposed expansion includes an additional mining area (Area 2) and a bulk water storage dam. Four additional underground mining blocks will be extracted for Area 2, and the dam will have a minimum capacity of 400 000m³. GPS: -26.499094;
Resurfacing of the R35 Section 2 from Bethal at km 0.00 to Middelburg at km 74.6 in the Steve Tshwete District Municipality, Mpumalanga Province. The GPS Marker has been placed at the start of the R35 in Bethal 26°27'37.6"S 29°28'11.7"E
Construction of eighteen houses with basic services infrastructure including water borne sanitation and septic tank for the Department of Land Reform and Rural Development, on portion 0 (remaining extent) of farm Tarbet 65, Msukaligwa Local Municipality, Mpumalanga. CIDB 7GB. The GPS has been placed
Construction of Western Highveld bulk water supply scheme, Work Package 2, in Dr JS Moroka Local Municipality, Nkangala District Municipality, Mpumalanga. CIDB 9CE. The villages: Masobe, Nokoneng, Mantiole, Mmaduma, Mmamethlake, Phake and Rankaile fall within 10 wards in Dr JS Moroka. The Works comprise
Construction of Western Highveld bulk water supply scheme, Work Package 1 for the Masobe, Nokoneng Mantiole, Mmaduma, Mmamethlake, Phake and Rankaile villages in Nkangala District Municipality, Mpumalanga. CIDB 9CE. The scope of work: Construction of raw water abstraction and pump station. This will
Construction of the Hendrina South Wind Energy Facility, on Portions 1, 3, 5, 6 and 7 of Dunbar 189 IS, Portions 11, 14 and 15 of Halfgewonnen 190 IS and the remaining extent and portions 0, 2, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of Weltevreden 193 IS, approximately 30km north east of Bethal and 15km
Improvement of National route N2 section 33 between KZN Border (km 0.0) to Bloemendal (km 34). This project is in the province of Mpumalanga and in the district municipality of Gert Sibande. CIDB 9CE. The marker has been placed on the N2 between the KZN Border and Bloemendal 27°14'01.2"S 31°13'07.8"E
Construction of new facilities at Setsheng Secondary School in Siyathemba Township, Balfour, Dipaleseng Local Municipality, Mpumalanga. Scope of works: In addition to the 21 classrooms, the completed school will include a multipurpose hall, library, science laboratory, nutrition centre. CIDB 7GB. The
Improvement of national route R581 Section 1 from R570 at km 0.0 to Tonga at km 26.74 in Nkomazi Local Municipality, Mpumalanga. The GPS marker has been placed at the start of construction 25°33'20.6"S 31°37'07.6"E
Demolition of unsafe structures and construction of new facilities at Mavimbela Primary School In Calcutta Trust, Mkhuhlu Township, Bushbuckridge Local Municipality, Mpumalanga. CIDB 7GB. The GPS co-ordinates are 24°58'05.2"S 31°12'54.8"E.