The Rukwa coal to power project is a proposed 300-megawatt coal-fired power station by Edenville Energy in Mkomolo, Rukwa, Tanzania. The construction of the 300-megawatt power plant is estimated to be built within 20 and 22 months. At completion of the power plant Edenville Energy will retain all its
The Nachu tenement covers approximately 199 km², and is situated west of the coastal city of Lindi and approximately 200km by road from the port city of Mtwara in Tanzania. The mineral resource is split into five deposits (Block B, D, F, FSL & J) with mineralisation hosted in graphitic schist within
Acacia Mining reports that more successful intersections on the Tusker gold resource area, within the Nyanzaga project, in Tanzania, have been found following earlier positive results. The PFS indicates that construction of the open pit (+-3 Mtpa) will commence first followed by underground mine (+-1
Implementation of the Zesta Project in the Makunduchi area, southeast of the main island of Unguja, Tanzania. As part of the project a 18MW facility will be built that will be equipped with a 40 MWh battery storage system, which will be connected to a 132kV substation to stabilise the power grid. There
The Lupa Goldfield is the second largest goldfield in Tanzania outside of the Lake Victoria Goldfield. From 1935 to 1959 an estimated 650,000 ounces of gold were extracted from the area. The Lupa Goldfields, located with the Ubendian model belt, is a triangular shaped block of approximately 2 600km²
Construction of an out patient department, laboratory, radiology and mortuary at the Samia Suluhu Hassan Rufiji Regional Referral Hospital, Songea, Tanzania. Value of the project is TZS 12 304 625 275.00 (R75 649 894.39). The GPS marker has been placed at the proposed location of works 10°40'51.5"S 35°39'04.1"
Construction of the National Social Security Fund building in Geita, Tanzania. Project cost is estimated at approximately TZS 10.4 Billion. The exact GPS location is not known and the Marker has been placed at Tanzanian Revenue Authority, -2.8759405, 32.2249810.
Construction of an 18 MWp Solar Photovoltaic Plant and a 40 MWh Battery Energy Storage System (BESS) with associated grid infrastructure on the Busheshe area (Shehia of Kijini) and the ZECO Kidatu area (Shehia of Mtoni Kidatu) in Makunduchi (South District) and West A District, Unguja Island, Tanzania.
Construction of a printing factory for the Tanzanian Exam Board at New Bagamoyo Road Adjacent to TBC1, Dar es Salaam Tanzania. The exact GPS location is not known and the Marker has been placed at Bagamoyo Road, Dar es Salaam, -6.66264, 39.1843635.
Construction of the Mombasa Kampala Kigali railway project which entails a 1,185km rail from Mombasa through Nairobi to Malaba and branching to Kisumu; a 1,400km rail from Malaba to Kampala and branching to four Ugandan towns before connecting to the main line to Rwanda at Mirima Hills; a 200km rail